Accelerated Bridge Construction (ABC) - Substructure
CONNECTION DETAIL
COMPONENTS CONNECTED
DESCRIPTION
Bar Coupler
UTILIZING
ADDITIONAL INFORMATION
DESIGN RECOMENDATIONS
ADVANTAGES CHALLENGE
• Both column and foundation can be precast and connected. • The connection is cumbersome to construct, and require tight bar length tolerance.
SCORE
Structural performance 5/5 (0 have significant issue, 5 same/better when compared to conventional CIP method)
Constructability 2/5 (0 difficult, 5 easily)
Speed of construction 3/5 (0 very slow, 5 very fast)
Cost 3/5 (0 very expensive, 5 cost effective when compared to conventional CIP method)
CONTACT INFORMATION
Organization Contact name Phone number E-mail
University of Nevada, Reno Zachary B. Haber M. Saiid Saiidi David H. Sanders saiidi@unr.edu